ADATA
PORTAL 360
Daily production
Assembly and test floor
AllDDR3DDR4FlashEMCP
LIVE 6s ago
14:32
Tue, Sep 24
Shift 2 14:00 to 22:00
⛶
Output today ↑ 4,2% vs yesterday
482.930units
92,9% of the 520.000 daily target
Yield today
99,42%
⚠ 0,37 below target 99,79%
Defects
1.284
0,27% of today's output
Active alerts
3
2 high · 1 medium
Output by hourLast 12 hours · target 22.000 units per hour Closed hourCurrent hour
Target 22.000 20k10k0 18.400 03040506 07080910 111213 now
Yield by macroprocess
Scale 97% to 100% · the notch marks each target
Assembly99,71%
FT Test99,88%
AVI99,62%
Wafer Taping98,01%
EMCP99,80%
97%98%99%100%
Production lines4 running · 0 stopped
Line A1Assembly
99,81%On target
128.400 units today
Line A2Assembly
99,44%Watch
119.200 units today
Line B1Wafer Taping
98,01%Below alert
96.800 units today
Line B2FT Test
99,88%On target
138.530 units today
Active alertsOldest first
⚠Wafer Taping yield 98,01%Line B1 · below alert 99,50%41 min
⚠Defect spike on BIN 10Line B1 · 312 units in one hour26 min
⚠Output 8% behind hourly targetLine A2 · Assembly12 min
On target Watch Below alert Auto refresh every 30 secondsPanel 1 of 2 · next in 18s
1No login, no queryThe screen is already on the wall and already showing the floor. Nothing to sign into, nothing to search for, no one to ask.
2Read at distanceType scale, contrast and density tuned for a wall seen from several metres away, not for a desk monitor.
3Status before numbersColour carries the state first. The exact value stays there for whoever has to act on it.
4One floor, one screenScoped to the lines the display serves. No filters to set, nothing to choose, nothing to get wrong.
5Nobody waits for the month to endOperators and engineers stopped waiting for the monthly report to learn how the product in front of them was performing.
6A candidate model for the groupPresented at ADATA global meetings and at the Taiwan headquarters for worldwide operations. The project went on to open 27 further engagements.